.
BEdotCYdotDEdotDKdotESdotFIdotFRdotGRdotHUdotITdotLUdotNLdotPLdotPTdotROdotSEdotUKdot
 
European Urban Knowledge Network
Home eukn.org
 
Home > E-library > Urban Policy > Transport and infrastructure > Water transport > ...
 
Print pageContactSitemap
-
  • E-library
  • Share your knowledge!
  • Research Services
  • About EUKN
  • News
  • Meetings
-
-
-
-Search site
Zoeken

Advanced search
-
-
Cases

Vuosaari Harbour p...Improving the Made...Peniche, a port co...more
SMILE - Sustainabl...The North Jutland ...

Researches
Reviving commercia...Accessibility and ...
Policies

Port of Los Angele...
-
Fishing port of Vlychada – Santorini, GR
Introduction
The jewel of the Cyclades islands, with its crescent moon shape and striking volcanic landscapes, Santorini (or Thera) is an island that has always posed problems for the safe anchorage of small vessels, particularly fishing boats.
Problem
Natural conditions in Santorini are not favourable for constructing and operating harbour facilities. To the west of the island, where a volcano collapsed into the sea following a tremendous eruption around 1500 BC (during the Minoan era), the island’s coastline is sheer and virtually inaccessible.
To the north and east, the coast suffers the full force of north and northwest winds. Further drawbacks include the lack of a natural protective harbour and the abundant alleviation, due to silting, which makes port construction difficult everywhere on the island. In bad weather conditions, boat owners on the island have had to haul their boats onto land and in winter they have had to shelter them on neighbouring islands.
Description
The fishing port of Vlychada was built to offset unfavourable natural conditions. It is located in the Thera district on the south coast, which was deemed to be the most appropriate site on the island.
The project, which received European aid, involved:
  • excavation work;
  • the construction of a dock and breakwater;
  • the construction of port buildings and access roads;
  • the installation of water and electricity distribution facilities;
  • the development of a rainwater drainage system;
  • the installation of boat service equipment and machinery;
  • the construction of a fuel station;
  • and other elements.

Results
The new port went into service in 1998. With a capacity for more than 200 boats, it has considerably boosted the local fishing sector, which is very important to the island’s economy.
The project has greatly benefited the island’s 10,000 inhabitants and also the many visitors who succumb to its charms during the tourist season.
Resources used
  • Total cost: 2.045 million euros
  • EU contribution: 1.533 million euros
Contact info
Technical services of the Cyclades prefecture
Mr Ioannis Alvertis, tel. +30 22810 82410
Project start date
01/01/1998
Links
Visit the Santorini websiteVisit the Santorini Regional Policy – Inforegio website

Document type
case
Themes
Urban Policy > Transport and infrastructure
Keywords
Water transport
 


-
Copyright-Masthead-Disclaimer-Privacy-RSS feed-EU-Eurocities-Urbact